☎Let's discuss your project438-350-6979
Menu

Frequently asked questions

Diesel generator FAQ

Guidance to prepare your diesel generator project. Exact specifications remain specific to each installation.

Choosing a generator

What generator power should I choose?

List the loads to be powered, including those needing extra starting power, then check voltage and phases. A quote can specify the appropriate model for your installation.

Can a generator power an entire home?

That depends on the selected capacity and the home's actual demand. Heating, pumps and other large appliances can significantly affect the result. Capacity is confirmed after the loads have been established.

What is the difference between standby and prime power?

Standby power is used during a grid outage. Prime power applies when the generator is the normal electricity source. Operating limits and permissible power ratings vary by model and its official specification sheet.

Does a generator start automatically?

Automatic starting can be provided with a compatible transfer system and suitable installation. It should not be assumed for every model.

Do the models operate at 60 Hz?

The specifications currently published show 60 Hz configurations. Frequency, voltage and phases must be confirmed for the unit offered in your quote.

Perkins generator maintenance

How often should a Perkins generator be serviced?

Plan an engine oil change every 250 operating hours and fuel filter replacement every 500 operating hours. Also perform routine checks before use. Consult the engine and generator set manuals for elapsed-time limits and adjustments specific to the model or operating conditions; earlier service may be required.

What should be checked before starting or during operation?

Monitor oil, coolant and fuel levels, battery condition, alarms and visible fuel, oil or coolant leaks. Also check the air intake, belts and exhaust. Follow the manual's safety instructions, with the engine stopped and cooled when required.

What checks should be done weekly or monthly?

Depending on usage frequency, inspect the air filter, belts, lines, battery and charger; check the fuel for water or sediment. A standby generator also needs periodic tests according to its manual. Oil, filter and coolant replacement is determined by model-specific intervals and operating conditions: monthly oil changes are not a general rule.

What service should be planned at 250, 500 and 1,000 hours?

Change the engine oil every 250 operating hours. At 500 hours, also replace the fuel filter. Other tasks, including those at 1,000 hours, depend on the model: air intake, fuel system and cooling system inspections, or mechanical adjustments. The engine manual specifies additional tasks, elapsed-time limits and special operating conditions. Entrust specialized work to a qualified technician.

Solution NRJ

How do you monitor the quality of custom models?

We visit factories several times a year to supervise selected custom models and monitor quality checks. These visits also keep us informed about new technologies, which we can discuss with you according to your project's needs.

Where does Solution NRJ provide services?

Solution NRJ serves Quebec as well as projects in Ontario and New Brunswick. Contact us to confirm availability in your area.

Meter readings and automatic transfer

Can I select a generator using meter DMW?

DMW can contribute to the assessment, but the unit, covered period and meter model must be confirmed. The load list and starting requirements are still needed. Read the guide.

Does DMW represent the previous 12 months?

Not necessarily. The period and resets must be checked for the exact meter. Do not treat a single reading as an annual maximum without confirmation. Read the guide.

Is my kWh consumption enough to select generator capacity?

No. kWh measures energy consumed over time. You must also assess the power of equipment operating together and its starting requirements. Read the guide.

Does an automatic transfer switch prevent every interruption?

No. Starting and transferring involve a delay depending on the system. For equipment that cannot tolerate interruptions, have a compatible uninterruptible power supply assessed. Read the guide.

Is the transfer switch included with the generator?

Included equipment must be specified in the quotation. A controller does not establish that the transfer switch, connections or commissioning are included. Read the guide.

Is your situation different?

Tell us about the equipment to be powered and the installation location.

Ask a question