☎Let's discuss your project438-350-6979
Menu

Perkins · 200 kW · Diesel

200 kW Perkins diesel generator

Perkins 200 kW diesel generator: Perkins 1106D-E70TAG5 engine (6 cylinders, 7 L, turbocharged), genuine Stamford alternator and Deep Sea DSE6120 controller, in a sound-attenuated enclosure with a 600 L tank. Available in 120/240 V, 120/208 V, 277/480 V and 347/600 V at the same price. $59,000 CAD before taxes. Load-bank tested for 2 hours (10 to 110%) and built for heavy-duty use, 24/7. Sold by Solution NRJ in Terrebonne.

Request a quote

Perkins 200 kW diesel generator in a sound-attenuated enclosure
Real photo of the Perkins 200 kW generator. More photos below.

Clear pricing to plan your purchase

Your configuration 200 kW

$59,000 CAD

Before taxes. Same price regardless of the voltage selected for the ordered configuration.

  • Engine heater included
  • Intelligent battery charger included
  • Preparation with oil and Prestone coolant included

Shipping is extra. Transfer switch sold separately. Installation must be specified in the quotation.

Request a quote for this model

Is this the right output for your needs?

For this rating, prepare a load assessment with your professional: critical equipment, motors, starting sequence and future needs. Voltage and phases are confirmed before ordering.

To confirm this configuration meets your needs, assess equipment that will operate together and the power required at startup.

Your priority equipment

Identify equipment that must operate simultaneously and loads that can remain off during an outage.

Motor starting

A pump or compressor may require more power at startup than during normal operation. Provide nameplate information to assess these requirements.

Your electrical configuration

Voltage, phase count and connected loads must be considered together. Confirm the configuration before ordering.

Unsure of your power requirements? Send an equipment list and nameplate photos. We can help identify the information needed to select a model.

Specifications of the shown configuration

Engine
Perkins 1106D-E70TAG5, 6 cylinders, 7 L, turbocharged
Alternator
Genuine Stamford
Controller
Deep Sea DSE6120
Starting
24 V
Enclosure
Sound-attenuated
Fuel tank
600 L
Available voltages
120/240 V single-phase, 120/208 V, 277/480 V and 347/600 V three-phase, same price
Price
$59,000 CAD before taxes
Warranty
1 year or 1,500 hours

Plan the connection

Provide your installation specifications. Voltage, phases, prime and standby ratings and dimensions must be confirmed for the proposed equipment.

Fuel capacity and runtime

600 L fuel tank. Its capacity alone does not determine runtime. Consumption varies with electrical load and operating conditions. Specify your desired duration so fuel requirements can be assessed.

Warranty: 1 year or 1,500 hours, whichever comes first.

Download the 200 kW technical sheet (PDF)

The Perkins 200 kW in photos

Real photos of the generator: engine, filters and exhaust.

Fuel injection rail on the 6-cylinder Perkins engine — génératrice diesel Perkins 200 kW
Fuel injection rail on the 6-cylinder Perkins engine
Exhaust and turbocharger — génératrice diesel Perkins 200 kW
Exhaust and turbocharger
Genuine Perkins filters: fuel and oil — génératrice diesel Perkins 200 kW
Genuine Perkins filters: fuel and oil
Engine control module and air filter — génératrice diesel Perkins 200 kW
Engine control module and air filter

Would you like automatic operation during an outage?

An automatic transfer switch transfers power between the utility and the generator. In a compatible installation, it detects an outage and coordinates transfer to backup power and then back to the utility.

Transfer switch selection and connection must be adapted to your installation with a qualified professional. Its price is specified separately in the quotation.

Plan with your installer

  • Priority circuits and transfer equipment
  • Location, ventilation and exhaust according to manufacturer requirements
  • Access for delivery and maintenance

Your questions before choosing

Can it supply my entire building?

That depends on actual loads, simultaneous use and starting requirements. Floor area or room count alone cannot determine the required output.

How is runtime determined?

Runtime depends on fuel capacity, consumption at the operating load and operating conditions. Confirm load assumptions before relying on a stated duration.

What should I send for a quotation?

Send a priority equipment list, nameplate photos, voltage and phase count if known. Also describe automatic transfer needs and desired operating duration.

How should maintenance be planned?

Consult the manual for the selected engine and generator. Intervals, consumables and tasks must be confirmed for this configuration.

Tell us about the equipment you need to power

Tell us what must stay running during an outage. With information about your installation, we can prepare a tailored quotation and specify the proposed configuration.

Request a quote for this model

Solution NRJ
438-350-6979
ventes@solutionnrj.com

Return policy

We do not accept returns.

See also

Our projects: generators delivered and installed, and workshop work, in photos.