Your priority equipment
Identify equipment that must operate simultaneously and loads that can remain off during an outage.
Perkins · 25 kW · Diesel
Solution NRJ, based in Terrebonne, Quebec, presents the following model: 25 kW Perkins diesel generator. Review the product information and request a quote from Solution NRJ to confirm the configuration for your project.
Perkins · Diesel
A configuration to be defined for your installation.
Clear pricing to plan your purchase
Price by quotation
Pricing and equipment will be confirmed according to your project requirements.
Included equipment, options and delivery terms will be detailed in your quotation.
Shipping, connection and commissioning must be specified in the quotation.
Prepare my quote requestCompare the requirements of your priority circuits before selecting this rating. Pricing, fuel capacity and electrical configuration for this model must be specified in the quotation.
To confirm this configuration meets your needs, assess equipment that will operate together and the power required at startup.
Identify equipment that must operate simultaneously and loads that can remain off during an outage.
A pump or compressor may require more power at startup than during normal operation. Provide nameplate information to assess these requirements.
Voltage, phase count and connected loads must be considered together. Confirm the configuration before ordering.
Unsure of your power requirements? Send an equipment list and nameplate photos. We can help identify the information needed to select a model.
Provide your installation specifications. Voltage, phases, prime and standby ratings and dimensions must be confirmed for the proposed equipment.
Fuel capacity alone does not determine runtime. Consumption varies with electrical load and operating conditions. Specify your desired duration so fuel requirements can be assessed.
Warranty: Terms applicable to the proposed equipment must be specified in the quotation.
An automatic transfer switch transfers power between the utility and the generator. In a compatible installation, it detects an outage and coordinates transfer to backup power and then back to the utility.
Transfer switch selection and connection must be adapted to your installation with a qualified professional. Its price is specified separately in the quotation.
That depends on actual loads, simultaneous use and starting requirements. Floor area or room count alone cannot determine the required output.
Runtime depends on fuel capacity, consumption at the operating load and operating conditions. Confirm load assumptions before relying on a stated duration.
Send a priority equipment list, nameplate photos, voltage and phase count if known. Also describe automatic transfer needs and desired operating duration.
Consult the manual for the selected engine and generator. Intervals, consumables and tasks must be confirmed for this configuration.
Tell us what must stay running during an outage. With information about your installation, we can prepare a tailored quotation and specify the proposed configuration.
Request a quoteSolution NRJ
438-350-6979
ventes@solutionnrj.com
We do not accept returns.