☎Let's discuss your project438-350-6979
Menu

Perkins · 20 kW · Diesel

Perkins diesel generator 20 kW

Perkins 20 kW diesel generator: Perkins 404D-22G engine, Stamford PI144D alternator and Deep Sea DSE6120 controller, in a sound-attenuated enclosure with a 400 L tank. $21,000 CAD before taxes. Load-bank tested for 2 hours (10 to 110%) and built for heavy-duty use, 24/7. Sold by Solution NRJ in Terrebonne.

Request a quote

Owner-supplied photo of the Perkins 20 kW
Photo supplied by Solution NRJ for this model. The delivered configuration is specified in your quotation.

Clear pricing to plan your purchase

Your configuration 20 kW

$21,000 CAD

Before taxes. Same price regardless of the voltage selected for the ordered configuration.

  • Engine heater included
  • Intelligent battery charger included
  • Preparation with oil and Prestone coolant included
  • Glow plugs

Shipping is extra. Transfer switch sold separately. Installation must be specified in the quotation.

Request a quote for this model

Get the price and spec sheet

The Perkins 20 kW spec sheet (PDF) and price are emailed to you, usually within minutes.

This information is used to respond to your enquiry. It does not subscribe you to a mailing list. Read our privacy policy.

Is this the right output for your needs?

Separate essential equipment from loads that can wait. This list helps assess a 20 kW configuration without assuming every circuit must operate together.

To confirm this configuration meets your needs, assess equipment that will operate together and the power required at startup.

Your priority equipment

Identify equipment that must operate simultaneously and loads that can remain off during an outage.

Motor starting

A pump or compressor may require more power at startup than during normal operation. Provide nameplate information to assess these requirements.

Your electrical configuration

Voltage, phase count and connected loads must be considered together. Confirm the configuration before ordering.

Unsure of your power requirements? Send an equipment list and nameplate photos. We can help identify the information needed to select a model.

Specifications of the shown configuration

Model
20 kW
Engine
Perkins 404D-22G, 4 cylinders
Alternator
Stamford
Shown voltage
120/240 V
Power factor
1.0 (120/240 V single-phase): 20 kW / 20 kVA
Also available in
120/208 V, 277/480 V and 347/600 V three-phase, same price
Enclosure
Sound-attenuated enclosure
Standard controller
Deep Sea DSE6120
Stated certifications
CSA · EPA Tier 3
Fuel tank
400 litres
Warranty
1 year or 1,500 hours, whichever comes first

Plan the connection

Voltage and phases must match your installation. Equal pricing across voltages does not mean the equipment can freely switch voltage. Confirm the ordered configuration before delivery.

Fuel capacity and runtime

Fuel capacity alone does not determine runtime. Consumption varies with electrical load and operating conditions. Specify your desired duration so fuel requirements can be assessed.

Warranty: 1 year or 1,500 hours, whichever comes first. Terms are specified in the quotation.

Download the 20 kW technical sheet (PDF)

Full technical specifications

Perkins engine

Model
404D-22G
Cylinders
4 inline, 4-stroke
Aspiration
Naturally aspirated
Displacement
2.2 L (2,216 cc)
Bore × stroke
84 × 100 mm
Compression ratio
23.3:1
Speed
1,800 rpm
Speed governor
Mechanical, speed droop ≤ 1%
Cooling
Liquid
Oil (total capacity)
10.6 L
Coolant
7 L
Fuel use at 75% load
About 4.3 L/h
Starting
Electric 12 V DC

Stamford alternator

Model
Stamford PI144D, CSA approved
Excitation
Brushless
Frequency
60 Hz at 1,800 rpm
Power factor
1.0 (120/240 V single-phase)
Voltage regulation
± 0.5% (no load to full load)
Insulation class
H
Protection rating
IP23

DSE 6120 controller

Display
Voltage, frequency, engine speed, battery voltage, running hours
Alarms
Over/under speed, low oil pressure, high temperature, failure to start, charger fault, emergency stop
Automatic shutdown
Low oil pressure, high temperature, over/under speed, failure after 3 start attempts

Equipment and testing

Load bank test
2 hours, from 10% to 110% load, with protection checks; adjusted and ready to use
Exhaust
Industrial silencer and flexible hose
Included
Block heater, smart battery charger, glow plugs
Design standards
ISO 8528, NEC, CEC

Data for the configuration shown. The ordered configuration is confirmed in the quotation.

Would you like automatic operation during an outage?

An automatic transfer switch transfers power between the utility and the generator. In a compatible installation, it detects an outage and coordinates transfer to backup power and then back to the utility.

Transfer switch selection and connection must be adapted to your installation with a qualified professional. Its price is specified separately in the quotation.

Plan with your installer

  • Priority circuits and transfer equipment
  • Location, ventilation and exhaust according to manufacturer requirements
  • Access for delivery and maintenance

Your questions before choosing

Can it supply my entire building?

That depends on actual loads, simultaneous use and starting requirements. Floor area or room count alone cannot determine the required output.

How is runtime determined?

Runtime depends on fuel capacity, consumption at the operating load and operating conditions. Confirm load assumptions before relying on a stated duration.

What should I send for a quotation?

Send a priority equipment list, nameplate photos, voltage and phase count if known. Also describe automatic transfer needs and desired operating duration.

How should maintenance be planned?

For the Perkins models shown, do the first break-in service (oil and oil filter) at 60 hours, then plan oil changes every 250 hours and fuel filter replacement every 500 hours. The engine manual also specifies calendar intervals, other tasks and special conditions.

Tell us about the equipment you need to power

Tell us what must stay running during an outage. With information about your installation, we can prepare a tailored quotation and specify the proposed configuration.

Request a quote for this model

Solution NRJ
438-350-6979
ventes@solutionnrj.com

Return policy

We do not accept returns.

Prepare your backup power project

For automatic backup operation, read our automatic transfer switch guide. The switch is sold separately and must suit your installation.

Our DMW meter guide explains demand readings. Share these readings with your equipment list; they do not replace a sizing assessment.

See also

Our projects: generators delivered and installed, and workshop work, in photos.